land projects 2020
july - november 2020 Work was completed for the reroute of the South Mesa Trail in Boulder, CO with the City of Boulder Open Space and Mountain Parks. This included building a rock wall, rock bench, and stone paving to stabilize a wash in a natural talus slope. This also involved building a staircase to aid in steep grade and finalizing new tread. And finally, the crew built a 450 foot long timber puncheon, to elevate the tread due to poor trail conditions.